Pazar, 09:30 
Building Alaska
Moving on to Plan X-Ray
Josh and his team install the second-story floor joists in their cabin; Chris runs out of lumber to build a dock, and the framers he hired don't show up; wrong cuts and measurements threaten to put John and Heather further behind than ever.